JOB SITE SAFETY CHECKLIST
SITE SUPERVISOR - Complete BEFORE construction begins and BI-WEEKLY thereafter.
PROJECT MANAGER - Copy to physical and/or digital Project Binder.
ACCOUNTING/RISK MANAGEMENT - File in Safety Compliance folder for minimum 5 years.
Project
Builder
Builder Representative
Representative email
Project Manager email
Risk Management email
Copy to
Inspection date
Program Administration
Job Board is secured in conspicuous location (https://www.builder-resources.com/Job-Board.html).
Yes
No
NA
Company contact information is posted.
Yes
No
NA
Emergency numbers are posted.
Yes
No
NA
Map to nearest emergency care facility is posted.
Yes
No
NA
Company safety program binder is available.
Yes
No
NA
OSHA 2000 log is accessible and in use.
Yes
No
NA
Housekeeping
Task lighting is adequate for conditions.
Yes
No
NA
All light bulbs are protected.
Yes
No
NA
Walkways are unobstructed.
Yes
No
NA
Waste containers are available and accessible.
Yes
No
NA
First Aid and Medical Services
Medical care location is clearly posted.
Yes
No
NA
Emergency contact list is posted.
Yes
No
NA
First aid supplies are readily available on job site.
Yes
No
NA
Additionally, each subcontractor has been instructed to provide first aid supplies for their crew.
Yes
No
NA
All injury incidents have been, and will be, fully investigated.
Yes
No
NA
All injury incident reports have been, and will be, filed within 6 days of incident.
Yes
No
NA
Personal Protective Equipment
Hard hats are, and will be, inspected and in use.
Yes
No
NA
Gloves and hand protection are, and will be, in use.
Yes
No
NA
Hearing protection is, and will be, in use.
Yes
No
NA
Eye protection is, and will be, inspected and in use.
Yes
No
NA
Footwear and clothing are, and will be, appropriate.
Yes
No
NA
Respiratory and dust protection is, and will be, in use.
Yes
No
NA
Fall Protection
Fall Protection Plan is on the jobsite.
Yes
No
NA
Framing subcontractor confirms that all employees and other users have been trained on fall protection.
Yes
No
NA
Plumbing subcontractor confirms that all employees and other users have been trained on fall protection.
Yes
No
NA
Roofing subcontractor confirms that all employees and other users have been trained on fall protection.
Yes
No
NA
Siding subcontractor confirms that all employees and other users have been trained on fall protection.
Yes
No
NA
Fall protection equipment has been, and will be, inspected before each use.
Yes
No
NA
Personal fall arrest systems are, and will be, inspected before each use.
Yes
No
NA
Excavations
Excavated area is barricaded.
Yes
No
NA
Adjacent structures are properly shored.
Yes
No
NA
Spoil setback is minimum 24 inches.
Yes
No
NA
Equipment is kept away from edge of cut.
Yes
No
NA
Ladder or steps provided to excavation.
Yes
No
NA
Excavations have been, and will be, inspected daily.
Yes
No
NA
Hand and Power Tools
Tools and cords are in good condition.
Yes
No
NA
All cords are grounded or double insulated.
Yes
No
NA
Subcontractor crew leaders have been instructed to visually inspect all tools prior to use.
Yes
No
NA
Proper guards are, and shall remain, in place on all tools.
Yes
No
NA
Personal Protective Equipment is in use by all workers on jobsite.
Yes
No
NA
Electrical
Electrical cords are, and will be, inspected DAILY.
Yes
No
NA
Ground Fault Circuit Interrupters are in use.
Yes
No
NA
Circuit breaker box is accessible.
Yes
No
NA
"Electrical" and "Overhead Dangers" sign is conspicuously posted.
Yes
No
NA
Underground utilities are located and staked.
Yes
No
NA
Ladders and Stairways
Ladders
Are in good condition.
Yes
No
NA
Are properly secured.
Yes
No
NA
Extend 36" above platform at each use instance.
Yes
No
NA
Are set at the appropriate angle to surface.
Yes
No
NA
Stepladders
Are fully opened when in use.
Yes
No
NA
Are used only as designed.
Yes
No
NA
Stairways
Have safety railing in place.
Yes
No
NA
Can support 400 pounds.
Yes
No
NA
Fire Safety
Flammables are properly stored.
Yes
No
NA
"No Smoking" signs are posted.
Yes
No
NA
Fire Extinguishers
Are properly located and accessible.
Yes
No
NA
Have been currently serviced.
Yes
No
NA
Are the correct type and quantity.
Yes
No
NA
Hazard Communications
Chemicals are labeled and stored safely.
Yes
No
NA
Safety Data Sheet (SDS) information is available for all chemicals being stored on site.
Yes
No
NA
Barricades and Fencing
Site is fenced.
Yes
No
NA
Roads are protected.
Yes
No
NA
Access to site is controlled
.
Yes
No
NA
Sidewalks are protected.
Yes
No
NA
Floor and Edge Protection
Any exposed edges have in place (choose all that apply):
Guardrails
Top Rails
Mid-Rails
Toe boards
Floor opening covers (choose all that apply):
Are secured and labeled
Can withstand twice the maximum floor load without deflecting more than 1/4"
Air Compressors
Pressure relief valve is functioning.
Yes
No
NA
Air filter is in place and functioning.
Yes
No
NA
Belt drive, if present, is enclosed.
Yes
No
NA
Condensation is drained periodically.
Yes
No
NA
"Auto-Start" is checked and functioning.
Yes
No
NA
All safety devices have been checked.
Yes
No
NA
Compressed Gas Cylinders
Valve protection is in place.
Yes
No
NA
Cylinders are secured to prevent falling over.
Yes
No
NA
Cylinder contents are clearly marked.
Yes
No
NA
Scaffolding
Scaffold structure is assembled by a competent person.
Yes
No
NA
All structural pieces are in good condition.
Yes
No
NA
All connections are solid and secure.
Yes
No
NA
Scaffolding is secured to structure.
Yes
No
NA
Footings are adequate with no settling.
Yes
No
NA
Planking cleats are in place.
Yes
No
NA
Working levels are fully planked.
Yes
No
NA
Planking overlap is adequate.
Yes
No
NA
Guardrails (top, mid-rail, toe board) are in use.
Yes
No
NA
Cross-bracing is installed and adequate.
Yes
No
NA
Protection from falling objects, if appropriate, is in place.
Yes
No
NA
Structure is, and will be, inspected daily.
Yes
No
NA
Welding and Cutting
Screens and shields are in place.
Yes
No
NA
Dedicated fire extinguishers are immediately available.
Yes
No
NA
Gas cylinder is secured upright.
Yes
No
NA
Welding cables are in acceptable condition.
Yes
No
NA
Subcontractor has been instructed that hot work is to be cool before it is left unattended.
Yes
No
NA
Electrical equipment is grounded.
Yes
No
NA
You have completed this periodic jobsite safety checklist.
Add the next inspection to your calendar NOW!!!
Note 1:
Note 2:
Note 3:
Note 4:
Note 5:
Submit Job Site Safety Report