Earthwork Scope of Work Dashboard |
|||||||
Builder Name: |
|||||||
Project: |
|||||||
Project Start Date: |
Scopes of Work issued: |
||||||
GoTo |
Scope of Work Phase |
Issued to |
Contact |
|
Phone |
Date |
|
Earthwork Subcontractor List |
|||||
Phase |
Subcontractor Business Name |
Contact |
Phone |
|
|
Project: |
||||||||||||
Provided to: |
Email: |
|||||||||||
Contact: |
Phone: |
|||||||||||
Date: |
||||||||||||
Objective of this Scope of Work |
||||||||||||
■ PUSH-OUT: to provide a site cleared of any obstructions, level and ready for construction. |
||||||||||||
■ BACKFILL: to fill in against foundation walls, to stabilize foundation walls, and create swales and berms. |
||||||||||||
■ FINAL GRADE: to prepare the site for final inspection and landscaping. |
||||||||||||
Terms used in this document |
||||||||||||
■ Site Superintendent: shall refer to any Company representative with authority to enforce this Scope of Work. |
||||||||||||
■ SUBCONTRACTOR: shall refer to the Subcontractor's organization, its employees, or any representative of the Subcontractor assigned the authority to perform per this Scope of Work. |
||||||||||||
Acceptable Performance |
||||||||||||
Excavation is divided into 3 sections—Pushout (Slab on Grade and/or Crawlspace/Basement), Backfill, and Final Grade. |
||||||||||||
While these sections will be performed at separate times, this Scope of Work covers all three sections. |
||||||||||||
Excavation Push-Out: Slab on Grade |
||||||||||||
■ The Subcontractor and the Site Superintendent shall identify any landscaping features to receive special consideration. |
||||||||||||
■ Trees, stumps, and any debris shall be removed. |
||||||||||||
■ Undisturbed natural area shall be identified and shall remain undisturbed. |
||||||||||||
■ Any disturbed natural area shall be re-compacted. |
||||||||||||
■ No debris of any kind may be buried on the lot. |
||||||||||||
■ Rough grading and leveling of the lot shall leave no major hills, valleys, holes, or excess trees. |
||||||||||||
■ The Subcontractor shall prepare a clear and level pad area extending a minimum of 30'-0" around building perimeter. |
||||||||||||
■ The Subcontractor shall cut in the driveway. |
||||||||||||
Excavation Push-Out: Additional for Crawlspace/Basement |
||||||||||||
■ Footings and foundation are to be within ±2" of dimensions on construction documents. |
||||||||||||
■ Basement slab depth shall be correctly calculated per plan. |
||||||||||||
■ No open overdigs shall be allowed within the interior of the foundation. |
||||||||||||
■ Perimeter overdig shall be at least 24" but shall not exceed 36". |
||||||||||||
■ Perimeter overdig shall be constructed to prevent cave-ins. |
||||||||||||
■ Drainage path for sump shall be cut and daylighted. |
||||||||||||
■ Excavated area shall be free of loose soil. |
||||||||||||
■ Access to basement area shall be provided for personnel and small equipment. |
||||||||||||
Excavation Backfill |
||||||||||||
■ The slab and foundation shall be backfilled, taking care not to damage rough plumbing, footings, window wells, etc. |
||||||||||||
■ The Subcontractor shall grade front and back yards to create swales and berms, as required, to ensure correct drainage of the lot. |
||||||||||||
■ The Subcontractor shall divert water to either the front of the house (to the street) or to natural creeks or other waterways. |
||||||||||||
■ No water is to be diverted onto neighboring lots. |
||||||||||||
■ Excess dirt shall be removed to a location determined by the Site Superintendent. |
||||||||||||
■ No debris of any kind may be buried on the lot. |
||||||||||||
Excavation Final Grade |
||||||||||||
■ Final grading of the lot shall leave it ready for landscaping. |
||||||||||||
■ Final grading around the house shall be to a level a minimum of 6" below the top of the foundation. |
||||||||||||
■ Inspections require a full 6" of exposed foundation. |
||||||||||||
■ Final grading shall repair the original swales and berms if any damage has occurred, ensuring the direction of the water flow is still correct. |
||||||||||||
■ No debris of any kind may be buried on the lot. |
||||||||||||
Other |
||||||||||||
Subcontractor acceptance or rejection (required): |
||||||||||||
(initial) |
I have read, understand, accept, and will comply with this Scope of Work |
|||||||||||
I do not accept this Scope of Work |
||||||||||||
Signing on behalf of Subcontractor |
Date of completion |
|||||||||||
Project: |
||||||||||||
Provided to: |
Email: |
|||||||||||
Contact: |
Phone: |
|||||||||||
Date: |
||||||||||||
Objective of this Scope of Work |
||||||||||||
■ To ensure that Landscaping materials are installed in a manner consistent with all applicable building codes, manufacturer's instructions and warranty requirements, and acceptable construction practices. |
||||||||||||
Terms used in this document |
||||||||||||
■ Site Superintendent: shall refer to any Company representative with authority to enforce this Scope of Work. |
||||||||||||
■ SUBCONTRACTOR: shall refer to the Subcontractor's organization, its employees, or any representative of the Subcontractor assigned the authority to perform per this Scope of Work. |
||||||||||||
Acceptable Performance |
||||||||||||
Landscaping: General |
||||||||||||
■ The landscaping Subcontractor is responsible for the appearance, drainage, and greenery of the house. |
||||||||||||
■ Experienced, trained personnel shall do all work. |
||||||||||||
■ The Subcontractor’s Work Order shall specify sod, seed, or a combination of sod and seed and what area the sod, if specified, shall cover. |
||||||||||||
■ Prior to any yard receiving seed or sod the yard shall be fine-graded. |
||||||||||||
■ Prior to any yard receiving seed or sod all rocks, unbreakable clumps of earth, construction debris, or other debris shall be removed. |
||||||||||||
■ Company shall determine the number and size of trees, shrubs, and/or flowers to be installed. |
||||||||||||
■ Shrubs and trees shall be of a size and number specified by Company. |
||||||||||||
■ All shrubs and trees shall be planted in soil that has been loosened prior to planting. |
||||||||||||
■ Once shrubs and trees are planted the soil should be packed to eliminate all air pockets and then watered. |
||||||||||||
■ The Subcontractor is to remove all formboards from drives, walks, patios, etc. which remain on the site. |
||||||||||||
■ Formboard material shall be stacked in the garage to be reused. |
||||||||||||
Landscaping: Details |
||||||||||||
■ The Subcontractor shall fine-grade the yard area to be landscaped to properly manage the water flow. |
||||||||||||
■ The grading of the yard shall be such that all swales or berms are finalized to ensure the correct flow of water. |
||||||||||||
■ Soil shall be leveled to remove any gullies, washes, large depressions, and humps. |
||||||||||||
■ If any swale or berm is incorrect to ensure correct water flow (6" of fall within 10'-0" of the house), notify the Site Superintendent. |
||||||||||||
■ The Subcontractor shall take all precautions to ensure no mechanicals are damaged during the fine-grading of the lot. |
||||||||||||
■ During the fine-grade the Subcontractor shall ensure soil is a minimum of 8" from the bottom of the first piece of siding on wall. |
||||||||||||
■ The yard shall be fine-raked to remove any construction debris and any other foreign debris that interferes with the appearance of the yard. |
||||||||||||
■ If the Work Order calls for sod, no sod shall be installed over washes, gullies, or large lumps. |
||||||||||||
■ Sod shall be laid with no gaps between squares. |
||||||||||||
■ Sod shall be sod stapled in such a manner to prevent movement of sod. |
||||||||||||
■ All sod and seed shall be watered immediately after installation. |
||||||||||||
■ All planting areas shall be formed in such a manner that the edge of the sod will be smooth and present a uniform appearance. |
||||||||||||
■ Jagged edges or an out-of-shape appearance is unacceptable. |
||||||||||||
■ At the completion of the installation all sod shall be rolled. |
||||||||||||
■ If weather is too dry to roll the sod, water shall be applied and sod shall be rolled before job will be considered complete. |
||||||||||||
■ Grass seed shall be applied at 50 pounds per 5,000 square feet of soil. |
||||||||||||
■ Fertilizer shall be applied as required by the area and the season of the year. |
||||||||||||
■ Straw shall be applied to completely cover the seeded area. |
||||||||||||
■ Planter areas shall have the soil loosened to ensure survival for shrubs and trees. |
||||||||||||
■ Shrubs and trees shall be of the type and number specified on the Work Order. |
||||||||||||
■ Shrubs and trees shall be planted in loosened soil, and then firmly packed to eliminate air pockets and watered. |
||||||||||||
■ All planter areas shall be covered with wood chips to protect new plants. |
||||||||||||
■ Any areas that do not require grass, such as under decks, should have wood chips applied to prevent weeds. |
||||||||||||
■ Any items found during the final inspection that need correction shall be corrected before final payment will be made. |
||||||||||||
Other |
||||||||||||
Subcontractor acceptance or rejection (required): |
||||||||||||
(initial) |
I have read, understand, accept, and will comply with this Scope of Work |
|||||||||||
I do not accept this Scope of Work |
||||||||||||
Signing on behalf of Subcontractor |
Date of completion |
|||||||||||
Project: |
||||||||||||
Provided to: |
Email: |
|||||||||||
Contact: |
Phone: |
|||||||||||
Date: |
||||||||||||
Objective of this Scope of Work |
||||||||||||
Terms used in this document |
||||||||||||
■ Site Superintendent: shall refer to any Company representative with authority to enforce this Scope of Work. |
||||||||||||
■ SUBCONTRACTOR: shall refer to the Subcontractor's organization, its employees, or any representative of the Subcontractor assigned the authority to perform per this Scope of Work. |
||||||||||||
Acceptable Performance |
||||||||||||
Template: General |
||||||||||||
Template: Details |
||||||||||||
Subcontractor acceptance or rejection (required): |
||||||||||||
(initial) |
I have read, understand, accept, and will comply with this Scope of Work |
|||||||||||
I do not accept this Scope of Work |
||||||||||||
Signing on behalf of Subcontractor |
Date of completion |
|||||||||||
Project: |
||||||||||||
Provided to: |
Email: |
|||||||||||
Contact: |
Phone: |
|||||||||||
Date: |
||||||||||||
Objective of this Scope of Work |
||||||||||||
Terms used in this document |
||||||||||||
■ Site Superintendent: shall refer to any Company representative with authority to enforce this Scope of Work. |
||||||||||||
■ SUBCONTRACTOR: shall refer to the Subcontractor's organization, its employees, or any representative of the Subcontractor assigned the authority to perform per this Scope of Work. |
||||||||||||
Acceptable Performance |
||||||||||||
Template: General |
||||||||||||
Template: Details |
||||||||||||
Subcontractor acceptance or rejection (required): |
||||||||||||
(initial) |
I have read, understand, accept, and will comply with this Scope of Work |
|||||||||||
I do not accept this Scope of Work |
||||||||||||
Signing on behalf of Subcontractor |
Date of completion |
|||||||||||
Project: |
||||||||||||
Provided to: |
Email: |
|||||||||||
Contact: |
Phone: |
|||||||||||
Date: |
||||||||||||
Objective of this Scope of Work |
||||||||||||
Terms used in this document |
||||||||||||
■ Site Superintendent: shall refer to any Company representative with authority to enforce this Scope of Work. |
||||||||||||
■ SUBCONTRACTOR: shall refer to the Subcontractor's organization, its employees, or any representative of the Subcontractor assigned the authority to perform per this Scope of Work. |
||||||||||||
Acceptable Performance |
||||||||||||
Template: General |
||||||||||||
Template: Details |
||||||||||||
Subcontractor acceptance or rejection (required): |
||||||||||||
(initial) |
I have read, understand, accept, and will comply with this Scope of Work |
|||||||||||
I do not accept this Scope of Work |
||||||||||||
Signing on behalf of Subcontractor |
Date of completion |
|||||||||||