PROJECT DASHBOARD

Project ID

Today's Date

Original Proposal

Total Project Direct Costs

Total of Line Items Over Budget

Change Order Total

Total Expenditures to Date

Over Budget for Completed Phases

Current Project Total

Total Budget Remaining

Number of Project Notes

Overhead Allocation

Total % Budget Spent

Builder's Margin

Total % Budget Remaining

-

FILE MANAGEMENT

CONSTRUCTION BUDGET

CHANGE ORDERS

DETAIL PAGES

Click for information on saving and reloading a JSON file created by this application.

Project Costs

Entries

Multiplier

Project Costs are tranferred from the individual Phase Detail Pages.

Enter net amounts for each phase in the Change Order.

Use to adjust TOTAL amount of Phase. 1.000=100%, 1.100 = 110%, 0.900 = 90%.Set for Company Template.

FIRST STEP - CREATE COMPANY TEMPLATE

Before creating project estimates, create the Company template. Enter Company Information on the Take-Off tab. On the Proposal, select Allowances, Transaction Notes, and Draw Schedule that will used as Company standard agreements. On the Detail Pages, review Multipliers, Cost Display Mode. In the Pricing Detail, review default ITEMS and add any other ITEMS desired at the "Enter .... Specification" cells. In the $$ Column, add pricing for any items added and update pricing in default items to current costs. Edit default ITEMS as needed. SAVE as "Estimate Template", following FILE MANAGEMENT instructions.

Job Cost Tracking

Overhead and Builder Margin

Cost Display Mode

At the end of each production month, gather cost code information from accounting system and enter.

Overhead and Builder's Margin amounts are calculated based on "Soft Cost %" in Take-Off tab.

Use to adjust rounding of TOTAL. X00 rounds up to $100, X,000 rounds up to $1,000. Set for Company template.

PROPOSAL

Pricing Detail

Allowances

Edit to reflect actual company pricing. Set for Company template.

Select Allowances you wish to show on proposal from dropdown menu. Set for Company template.

LOAN COST CALCULATOR

Borrower Interest Rate

Based on Interest Rate% entered in Construction Loan section of "Soft Cost %" in Take-Off tab.

Item

Transaction Notes

All ITEMS are editable. Build your own database or use the default ITEMS. Make changes to the database items prior to selecting items to be included in the estimate. Set for Company template.

TAKE-OFF

Select Transaction Notes you wish to include on proposal from dropdown menu. Set for Company template.

Company Information

Amount Borrowed

Complete Company Information, Overhead Calculator, and Soft Cost% sections. Set for Company template.

Use amount to be borrowed from Lender, not total project cost.

Project Notes

Enter additional transaction notes not found in dropdown.

Qty Manual

Project Information

Manual Monthly Draw

QTY is transferred from "Take-Off" tab. Manually edit if desired.

Complete specific Project Information, Location, and SF information.

Calculator assumes average monthly draw over project duration period shown in "Overhead Calculator" on "Take-Off" tab. Manually enter if monthly draw amount varies.

Pre-Agreement Changes

Enter changes to Initial Specifications and note if approved by Buyer. Create Change Order 01 from list.

$/Unit Manual

Building Phase Information

$/Unit is transferred from "Pricing Detail" database on Detail Page. Manually edit if desired.

Complete specific construction phase information (quantities) for the Project.

Draw Schedule

Select milestone from dropdown. Enter % of total contract due at milestone. Set for Company template.

PROJECT NOTES

PROJECT TAKE-OFF

Builder-BOS Estimator

COMPANY INFORMATION

PROJECT INFORMATION

OVERHEAD (OH) CALCULATOR

Use this number for project overhead?

Revenue Production Capacity (mo)

Avg. Overhead (mo)

Project Duration (mo)

Expected Sales Price of this project (Adjust this number as the estimate develops)

OH % of Sales Price

"Revenue Production Capacity (mo)" is the maximum monthly sales from all projects the Company is capable of producing given the existing overhead structure.

SOFT COST %

% Sale $

LABOR

CONSTRUCTION LOAN

Supervision Rate % (enter decimal)

Laborer ($$/HR)

Interest Rate% (enter decimal)

Company Overhead % (enter decimal)

Labor Burden% (enter decimal)

LOCAL SALES TAX RATES

LOCATION

Builder Margin (Profit) % (enter decimal)

Total Labor Rate

Tax Rate % (enter decimal)

Project setback from Utility Access (feet)

Contingency % (enter decimal)

PROJECT HARD COST BREAKDOWN

FINISHED SF UNDER ROOF

SF

SF

Liability Insurance % (enter decimal)

Material as % of Cost

Finished Basement

Bonus Room

Real Estate Commission $$

Labor as % of Cost

Main Floor

Room Over Garage

2nd Floor

Shop

WINDOWS

EXTERIOR GLASS DOORS

3rd Floor

Qty

SF Glass

Garage

Total Finished SF Under Roof

UNFINISHED SF UNDER ROOF

SF

SF

Unfinished Basement

Covered Porch

Unfinished Garage

Covered Deck

Unfinished Room Over Garage

Covered Patio

Unfinished Shop

Total Unfinished SF Under Roof

UNCOVERED SF

SF

SF

Uncovered Porch

Uncovered Patio

Uncovered Deck

Total Uncovered SF

EXTERIOR DOORS (Inc. GARAGE DOOR)

Basement

Main Floor

Second Floor

Third Floor

Total

FOOTINGS

LF

CY

12 in.x 6 in. footings (1-story) L&M

15 in.x 6 in. footings (2-story) L&M

18 in.x 8 in. footings (3-story) L&M

EA

24 in.x 24 in.x 12 in. Spread Footer

Total CY Concrete for Footings

Total Exterior Doors

FOUNDATION WALL

Length (ft)

SF

CY

8 x 8 x16 CMU

2-0 x 8 in. crawlspace wall

ROOFING

Qty

ROOF COMPONENTS

Qty

4-0 in.x 8 in. crawlspace wall

Plan View SF of Roof (incl. overhang)

Roof OSB 4' x 8'

8-0 in.x 8 in. basement wall

Dominant Roof Pitch (Rise/12)

Fascia LF

10-0 in.x 10 in. basement wall

Roofing Squares

Starter Strip LF

Totals

Rafter Spacing (Framed roof only)

Hip & Ridge LF

Average $/SF Coverage -Trusses

Gutter LF

OTHER FLATWORK

Information regarding Basement pad, House pad, Garage pad and Shop pad has been transferred to Foundation Detail Page. This section is for additional flatwork.

Crane time in hours

Downspouts EA

Length (ft.)

Width (ft)

Depth (in)

SF

CY

PLUMBING FIXTURES

Qty

ELECTRICAL ROUGH-IN LABOR

Qty

DOOR HARDWARE

Qty

Totals

STRUCTURAL SPACING

O.C. in.

LF Required

I-Joist

Total roughed-in fixtures

Floor Truss

CABINET HARDWARE

BATH HARDWARE

EXTERIOR WALLS

Length

Type

Height

SF

Qty

Qty

Total Holes:

Total LF Exterior Wall

INTERIOR DOORS

Basement

Main Floor

Second Floor

Third Floor

Total

GABLES

EXTERIOR CORNERS

Gable Span in feet

Pitch/12

Area Round Up

Main Floor

2nd Floor

3rd Floor

MISCELLANEOUS

Qty

# of Stair Treads

Lineal Feet of LVL

EXTERIOR WALL ANALYSIS

SF

By Floor

SF

Totals

SF

Ext 2x4 Wall

Exterior Wall-Base

Gable Area

Total Interior Doors Components

Ext 2x4 Dbl Wall

Exterior Wall-1st

Insulated Wall

CABINETS (LF)

LF

Location

Ext 2x6 Wall

Exterior Wall-2nd

Total Ext Walls

FLOOR COVERINGS

SF

SY

Superior Wall

Exterior Wall-3rd

Ext. Wall OSB 4'x8'

Carpet

2 x 4 SIP Wall

Exterior Wall-Garage

Vinyl

2 x 6 SIP Wall

Exterior Wall-Other

Tile

Wood Laminate

INTERIOR WALLS

Length

Type

Height

SF

Wood

SHELVING

EA

Location

Total Lineal Feet Cabinets

COUNTERTOPS

SF

Location

Total LF Interior Wall

Total SF Interior 2x4 Wall

Total SF Interior 2x6 Wall

Total SF Interior 2x8 Wall

DRYWALL

Exterior Walls SF

1/2 in. x 4-0 x 8-0 Sheets

Interior Walls SF

5/8 in. x 4-0 x 8-0 Sheets

Ceiling SF

Total Drywall SF

Total SF Countertop

Total Shelf Units

CONSTRUCTION BUDGET

PROJECT ID:

Job Buyer:

Project Address:

Buyer Telephone:

Project City, State, ZIP:

Buyer Email:

Enter Actual Project Start Date:

Job Cost Tracking

PROJECT COSTS

Estimated Cost

% of Total Proposal

Change Orders

Comments

Actual Bid/Cost

Month 2

Month 3

Month 4

Month 5

Month 6

Month 7

Month 8

Month 9

Month 10+

Total Job Expenditures

Budget Remaining

Line Items Over Budget

Phase Complete?

Direct Cost Analysis

Month 2

Month 3

Month 4

Month 5

Month 6

Month 7

Month 8

Month 9

Month 10+

Total Job Expenditures

Budget Remaining

Line Items Over Budget

Over Budget for Completed Phases

Subtotal - Soft Costs

Soft Cost Expenditures by Month

Subtotal - Construction Costs

Hard Cost Expenditures by Month

Total Project Direct Costs

Total Expenditures by Month

Margin

Percent of Costs Expensed by Month

Company Overhead (G&A)

Total Expenditures Project to date

Builder's Margin

Total Expenditures Percent to date

Total Project Price

Round to

Real Estate Commission

Total Proposal Price

Round to

Change Order Overhead

Change Order Builder's Margin

Change Order Total

Total Project Price + Change Orders

CONSTRUCTION PROPOSAL

Proposal Date:

For Project:

Subject to the ALLOWANCES, TRANSACTION NOTES, PROJECT NOTES, PRE-AGREEMENT CHANGES FROM COMPANY STANDARDS, and PAYMENT SCHEDULE listed below, and to the acceptance and execution of all construction documents, the proposed price for this project is:

Allowances include:

Construction Item

Allowance

Construction Item

Allowance

Transaction Notes:

Additional Notes:

Pre-Agreement Changes from Company Standards Requested

Accepted changes will be documented on Change Order 1, which will be part of the Agreement package.

Change Requested

Add or Deduct

Approved

Draw Schedule

Approving and Accepting as Buyer:

Approving and Accepting as Buyer:

Accepting for Company:

CHANGE ORDER CALCULATOR for

Change Order Costs

CO1

CO2

CO3

CO4

CO5

CO6

CO7

CO8

CO9

CO10

CO11

CO12

CO13

CO14

CO15

CO16

CO17

CO18

CO19

CO20+

Total Line Item CO

Change Order Date

Architecture & Engineering

Permits and Fees

Temporary Utilities

Construction Loan

Supervision

Contingency

Liability Insurance

Warranty

Demolition

Earthwork, Base, Gravel

Onsites-Laterals, Septic, Water

Footings, Foundation

CMU Foundation

Framing Material

Framing Labor-Install Openings

Exterior Doors, Garage Doors

Windows, Sliding Glass Doors

Window Wells

Heating, Ventilation, AC

Plumbing

Plumbing Fixtures

Electrical

Electrical Fixtures

Fireplace

Solar

Roofing

Soffit, Fascia

Siding

Gutter, Downspouts

Insulation

Drywall

Interior Millwork

Finish Carpentry Labor

Interior Paint

Cabinets

Countertops

Shelving

Bath, Shower Surrounds

Floor Coverings

Ceiling Treatments

Mirrors, Shower Doors

Door Hardware

Bath Hardware

Appliances

Final Cleaning

Concrete Flatwork

Landscaping

Subtotal of Costs

Add for Company Overhead (G&A)

Add for Builder's Margin

Total Change Order

Adjusted Total Project Price

Total Percentage Change

Construction Loan Calculator

Borrower Interest Rate:

Amount Borrowed:

TOTAL:

ITEM

Month

Manual Monthly Draw

Monthly Draw

Cumulative Monthly Draw

Monthly Interest Expense

Cumulative Interest Expense

Comment

LOAN DRAW INFORMATION

At end of month

At end of month

At end of month

At end of month

At end of month

At end of month

At end of month

At end of month

At end of month

At end of month

At end of month

At end of month

Total

Architectural and Engineering Detail

Link to Quote:

Pricing Detail

Architect/Engineer Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

Total

Permits and Fees Detail

Link to Quote:

Pricing Detail

Permits and Fees Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

Total

Temporary Utilities Detail

Link to Quote:

Pricing Detail

Temporary Utilities Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

Total

Warranty Detail

Link to Quote:

Pricing Detail

Warranty Multiplier:

Select the Cost Display Mode:

TOTAL:

If desired warranty charge exceed 5%, use multiple entries. E.G. desired warranty charge equals 9%. Enter 4%+5%, or 3%+3%+3%.

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

ITEM

UNIT

$$

Link

QTY

Total

Demolition Detail

Link to Quote:

Pricing Detail

Demolition Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

Total

Demolition Hourly Rate uses the "Total Labor Rate" from TAKE-OFF. "Tear Down Structure" hourly rate assumes a skilled equipment handler.

Earthwork, Base, Gravel Detail

Link to Quote:

Pricing Detail

Earthwork Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

⌂ SITE CLEARING ⌂

⌂ EXCAVATION ⌂

⌂ IMPORT/EXPORT MATERIAL ⌂

⌂ BACKFILL ⌂

⌂ DRAINAGE GRADE ⌂

⌂ FINISH GRADE ⌂

⌂ FILL - BASE, GRAVEL ⌂

Total

Onsites - Septic, Water, Power Detail

Link to Quote:

Pricing Detail

Onsite Utilities Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

⌂ SEPTIC ⌂

⌂ WATER ⌂

⌂ POWER ⌂

Total

Concrete Foundation Detail

Link to Quote:

Pricing Detail

Foundation Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

⌂ FOOTINGS ⌂

⌂ FOUNDATION PAD ⌂

⌂ CRAWLSPACE FOUNDATION ⌂

⌂ BASEMENT FOUNDATION ⌂

⌂ WATER MANAGEMENT ⌂

Total

CMU Foundation Detail

Link to Quote:

Pricing Detail

CMU Block Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

Total

Framing Materials Detail

Link to Quote:

Pricing Detail

Framing Material Multiplier:

Select the Cost Display Mode:

TOTAL:

To calculate framing lumber costs ($$/MBF), contact your lumber supplier and get pricing for a 2x6x10-0 stud of the lumber you use for framing. Multiply that price by 100 to get the non-discounted price per thousand board feet you pay for framing lumber.

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

⌂ FLOOR STRUCTURE ⌂

ITEM

UNIT

$$

Link

QTY

⌂ MAJOR COMPONENT PRICING ⌂

Framing Lumber Costs ($$)

MBF

OSB - 7/16 in. 4-0 x 8-0

EA

⌂ WALL STRUCTURE ⌂

⌂ ROOF STRUCTURE ⌂

⌂ OTHER STRUCTURAL COMPONENTS ⌂

Total

Wall, Exterior components =

2x Studs 16 in. OC, 2x top plate, 1x bottom plate, OSB sheathing, headered opening every 8 feet

Wall, Interior components =

2x Studs 16 in. OC, 2x top plate, 1x bottom plate, OSB sheathing, headered opening every 8 feet

Dbl Wall, Ext components =

Two walls, offset 2x studs 24 in. OC, 2x top plate, 1x bottom plate, OSB sheathing, header opening every 8 feet

Framing Labor Detail

Link to Quote:

Pricing Detail

Framing Labor Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

Total

Soffit & Fascia Detail

Link to Quote:

Pricing Detail

Soffit & Fascia Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

Total

Exterior Openings Install Labor Detail

Link to Quote:

Pricing Detail

Exterior Opening Install Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

Total

HVAC Detail

Link to Quote:

Pricing Detail

HVAC Multiplier:

Select the Cost Display Mode:

TOTAL:

To calculate HVAC Rough Labor and Materials cost ($$/SF), review the last few invoices from your HVAC subcontractor for projects of the same quality as this project. Divide the cost for the installation by the finished square footage of the project. Average the per square foot cost from the last few projects, and that will provide an expected cost for the HVAC labor and materials per square foot for this project. Amount is broken down to 60% for materials, 40% for labor.

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

ITEM

UNIT

$$

Link

QTY

Total

Plumbing Labor Detail

Link to Quote:

Pricing Detail

Plumbing Labor Multiplier:

Select the Cost Display Mode:

TOTAL:

A "Plumbing Hole" is a plumbing termination point like a sink, toilet, or outdoor spigot. To calculate Plumbing Rough Labor and Materials per hole, review the last few invoices from your PLUMBING subcontractor for projects of the same quality as this project. Do not include the cost of fixtures. Divide the cost for the rough installation by the number of plumbing holes. Average the price per hole from the last few projects, and that will provide an expected "Sub-Rough per hole".

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

ITEM

UNIT

$$

Link

QTY

Total

Plumbing Fixtures Detail

Link to Quote:

Pricing Detail

Plumbing Fixture Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

Total

Electrical Labor Detail

Link to Quote:

Pricing Detail

Electrical Labor Multiplier:

Select the Cost Display Mode:

TOTAL:

To calculate Electrical Rough Labor and Materials cost per square foot, review the last few invoices from your ELECTRICAL subcontractor for projects of the same quality as this project. Do not include the cost of finish fixtures. Divide the cost for the rough installation by the finished square footage of the project. Average the per square foot cost from the last few projects, and that will provide an expected cost for the ROUGH ELECTRICAL (without fixtures) per square foot for this project. Amount is broken down to 30% materials, 70% labor.

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

ITEM

UNIT

$$

Link

QTY

Total

Electrical Fixtures Detail

Link to Quote:

Pricing Detail

Electrical Fixture Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

Total

Fireplace Detail

Link to Quote:

Pricing Detail

Fireplace Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

Link to Quote:

Pricing Detail

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

Total

Exterior Doors Detail

Link to Quote:

Pricing Detail

Exterior Door Multiplier

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

Total

See Exterior Door INSTALLATION COSTS at "ExtOpeningsLabor" tab

Windows Detail

Link to Quote:

Pricing Detail

Window Multiplier:

Select the Cost Display Mode:

TOTAL:

To determine $/sf, contact window supplier and request the average $/sf for each type of window. Alternatively, price a 3-0 x 5-0 window for each type and divide price by 15.

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

ITEM

UNIT

$$

Link

QTY

Total

See Window INSTALLATION COSTS at "ExtOpeningsLabor" tab

Exterior Glass Doors Detail

Link to Quote:

Pricing Detail

Exterior Glass Door Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

Total

See Exterior Glass Door INSTALLATION COSTS at "ExtOpeningsLabor" tab

Window Wells Detail

Link to Quote:

Pricing Detail

Window Well Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

Total

See Window Well INSTALLATION COSTS at "ExtOpeningsLabor" tab

Roofing Detail

Link to Quote:

Pricing Detail

Roofing Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

⌂ ROOFING LABOR ⌂

⌂ ROOFING MATERIALS ⌂

⌂ ROOFING EXTRAS ⌂

Total

Gutter and Downspout Detail

Link to Quote:

Pricing Detail

Gutter Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

Total

Following are the detail sections for SIDINGS. All sidings are combined on the estimate. Additional sidings items can be added at the "Other Siding Details" section at the bottom of the page.

Stucco Siding Detail

Link to Quote:

Pricing Detail

Stucco Siding Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

⌂ STUCCO TYPE ⌂

Quote

-

3-Step Cementitious Stucco Cost

SF Wall

Synthetic Stucco Cost

SF Wall

Total

Fiber Cement Siding Detail

Link to Quote:

Pricing Detail

Fiber Cement Siding Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

⌂ FIBER CEMENT LAP SIDING ⌂

Quote

-

Fiber Cement Lap Siding Materials

SF Wall

Fiber Cement Lap Siding Labor

SF Wall

1 x 4 Engineered Wood Trim

LF

1 x 6 Engineered Wood Trim

LF

1 x 4 Engineered Wood Trim Labor

LF

1 x 6 Engineered Wood Trim Labor

LF

Total

Engineered Wood Siding Detail

Link to Quote:

Pricing Detail

Engineered Wood Siding Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

⌂ ENGINEERED WOOD LAP SIDING ⌂

Quote

-

⌂ SIDING-LAP SIDING⌂

Engineered Wood Lap Siding

SF Wall

Engineered Wood Lap Siding Labor

SF Wall

1 x 4 SmartsideTrim

LF

1 x 6 SmartsideTrim

LF

1 x 4 Trim Labor

LF

1 x 6 Trim Labor

LF

⌂ ENGINEERED WOOD PANEL SIDING ⌂

Quote

-

Engineered Wood Panel Siding

SF Wall

Engineered Wood Panel Siding Labor

SF Wall

⌂ SIDING-PANEL ⌂

1 x 4 SmartsideTrim

LF

1 x 6 SmartsideTrim

LF

1 x 4 Trim Labor

LF

1 x 6 Trim Labor

LF

Total

Wood Siding Detail

Link to Quote:

Pricing Detail

Wood Siding Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

⌂ WOOD SIDING-T&G ⌂

Quote

-

⌂ SIDING-1x6 T&G ⌂

T&G Wood Lap Siding

SF Wall

T&G Wood Lap Siding Labor

SF Wall

1 x 4 Wood Trim

LF

1 x 6 Wood Trim

LF

1 x 4 Trim Labor

LF

1 x 6 Trim Labor

LF

⌂ WOOD SIDING-T-111 Panel ⌂

Quote

-

T-111 Wood Panel Siding

SF Wall

T-111 Wood Panel Siding Labor

SF Wall

⌂ SIDING-T-111 Panel ⌂

1 x 4 WoodTrim

LF

1 x 6 WoodTrim

LF

1 x 4 Trim Labor

LF

1 x 6 Trim Labor

LF

Total

Brick Siding Detail

Link to Quote:

Pricing Detail

Brick Veneer Siding Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

⌂ FACE BRICK SIDING ⌂

Quote

-

Face Brick Siding Materials

SF Wall

Face Brick Siding Labor

SF Wall

⌂ BRICK VENEER SIDING ⌂

Quote

-

Brick Veneer Siding Materials

SF Wall

Brick Veneer Siding Labor

SF Wall

Total

Stone Siding Detail

Link to Quote:

Pricing Detail

Stone Siding Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

⌂ NATURAL STONE SIDING ⌂

Quote

-

Natural Stone Siding Materials

SF Wall

Natural Stone Siding Labor

SF Wall

⌂ STONE VENEER SIDING ⌂

Quote

-

Stone Veneer Siding Materials

SF Wall

Stone Veneer Siding Labor

SF Wall

Total

Other Siding Detail

Link to Quote:

Pricing Detail

Other Siding Multiplier:

1.000

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

⌂ OTHER SIDING ⌂

Total

Insulation Detail

Link to Quote:

Pricing Detail

Insulation Multiplier:

Select the Cost Display Mode:

TOTAL:

The closed cell foam pricing is for a board foot (12 in x 12 in x 1 in). The cost will be multiplied by the thickness in inches of the application. Multiple-inch applications are calculated at 80% of the board foot price X the thickness in inches.

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

⌂ FIBERGLASS INSULATION ⌂

ITEM

UNIT

$$

Link

QTY

⌂ CELLULOSE INSULATION ⌂

⌂ CLOSED-CELL FOAM INSULATION ⌂

⌂ INSULATION EXTRAS ⌂

Total

Drywall Detail

Link to Quote:

Pricing Detail

Drywall Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

Total

Finish Carpentry Labor Detail

Link to Quote:

Pricing Detail

Finish Carpentry Labor Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

Interior Door Detail

Link to Quote:

Pricing Detail

Interior Door Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

All doors are priced as 3-0 wide

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

Total

See Interior Door INSTALLATION COSTS at "FinCarpLabor" tab

Millwork Detail

Link to Quote:

Pricing Detail

Millwork Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

⌂ BASE ⌂

⌂ CASING ⌂

⌂ WINDOW TRIM ⌂

⌂ OTHER TRIM ⌂

⌂ STAIRS ⌂

⌂ MILLWORK SPECIALTY ⌂

Total

See Millwork INSTALLATION COSTS at "FinCarpLabor" tab

Cabinet Detail

Link to Quote:

Pricing Detail

Cabinets Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

Total

See Cabinet INSTALLATION COSTS at "FinCarpLabor" tab

Countertops Detail

Link to Quote:

Pricing Detail

Countertops Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

Total

See Countertops INSTALLATION COSTS at "FinCarpLabor" tab

Shelving Detail

Link to Quote:

Pricing Detail

Shelving Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

Total

See Shelving INSTALLATION COSTS at "FinCarpLabor" tab

Paint Detail

Link to Quote:

Pricing Detail

Paint Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

Total

Mirrors and Shower Doors Detail

Link to Quote:

Pricing Detail

Mirrors & Shower Doors Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

Total

Bath and Shower Surrounds Detail

Link to Quote:

Pricing Detail

Bath & Shower Surround Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

⌂ BATH & SHOWER SURROUND COMPONENTS ⌂

Quote

-

1

Surround Install Labor ($$/SF)

SF

1

Tile Material Cost ($$/SF)

SF

1

Cultured Marble Material Cost ($$/SF)

SF

1

Marble Material Cost ($$/SF)

SF

1

Granite Material Cost ($$/SF)

SF

1

Shower Pan - Site-Build

EA

500.00

1

Total

Bath Hardware Detail

Link to Quote:

Pricing Detail

Bath Hardware Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

Total

Door Hardware Detail

Link to Quote:

Pricing Detail

Door Hardware Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

⌂ CABINET HARDWARE ⌂

Total

Ceiling Treatment Detail

Link to Quote:

Pricing Detail

Ceiling Covering Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

Total

Floor Coverings Detail

Link to Quote:

Pricing Detail

Floor Covering Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$/Unit Manual

$/Unit

Extension

Source

Comment

Total

Appliances Detail

Link to Quote:

Pricing Detail

Appliances Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

Total

Concrete Flatwork Detail

Link to Quote:

Pricing Detail

Flatwork Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

Total

Landscaping Detail

Link to Quote:

Pricing Detail

Landscaping Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

Total

Final Cleaning Detail

Link to Quote:

Pricing Detail

Final Cleaning Multiplier:

Select the Cost Display Mode:

TOTAL:

ITEM

UNIT

$$

Link

QTY

ITEM

QTY Manual

QTY

Unit

$$ Manual

$/Unit

Extension

Source

Comment

Total