MIRRORS and SHOWER DOORS
SCOPE OF WORK

Objective of this Scope of Work

► To ensure that Mirrors and Shower Doors are installed in a manner consistent with all applicable building codes, manufacturer's instructions and warranty requirements, and acceptable construction practices.

Terms used in this document

►SITE SUPERINTENDENT: shall refer to any Builder representative with authority to enforce this Scope of Work.
►SUBCONTRACTOR: shall refer to the Subcontractor's organization, its employees, or any representative of the Subcontractor assigned the authority to perform per this Scope of Work.

Acceptable Performance
Mirror-Shower Door: General

► Plans are subject to changes and modifications. It is the responsibility of the Subcontractor to verify with the Site Superintendent that the plans have not changed before beginning work. The Subcontractor will correct any errors that occur from using an incorrect set of plans at no cost to Company.
► Mirrors will be of the number, type, and size specified per plan and Work Order.
► Installation shall be done by experienced, trained personnel.
► Installation shall ensure that there is no damage to drywall or other finished work.
► Neither mirrors nor shower doors shall be installed if they are chipped, scratched, cracked, or if the backing has been damaged.
► House shall be left clean, broom-swept, and all debris shall be removed to the dumpster or to the designated trash site.
► Any items found during the final inspection that need correction, shall be corrected before payment will be made.

Mirror-Shower Door: Detail

► All mirrors shall be installed per the installation instructions of the manufacturer with the suggested fasteners.
► All mirrors shall be installed per plan.
► All mirrors shall be installed level, plumb, and square with no damage to drywall or existing work.
► Shower doors shall be of the size, number, and type specified by Company. No substitutions are allowed.
► All shower doors shall be installed per the installation instructions of the manufacturer with the suggested fasteners.
► All shower doors shall be installed per plan.
► All shower doors shall be installed level, plumb, and square with no damage to doors, shower stall, or existing work.
► Shower doors shall be installed so there will be no leakage during normal use.