SUBCONTRACTOR TERMS AND CONDITIONS






Construction Requirements
►The work of all Subcontractors, their employees, and/or trades is expected to be performed in a competent and workmanlike manner. Workmanlike quality is defined as workmanship which meets or exceeds those criteria indicated in the building codes, using materials and installation methods identified in the construction plans, Company's Scope of Work and defined by industry standards for each trade.
►The Subcontractor is required to be familiar with the latest Scope of Work for its trade. A copy of the latest Scope of Work will be made available upon request. Copies of Scopes of Work and Inspection Reports may also be downloaded from the Company website.

Safety
►The Subcontractor acknowledges that it has its own Safety and Hazard-Communication program for its employees and/or trade contractors.
►Subcontractor agrees to comply with OSHA and/or any other governmental agency’s safety rules and regulations.
►Should any citations, fines, and/or penalties, etc., be incurred by Company due to the negligence or oversight of the Subcontractor, the Subcontractor agrees to indemnify and reimburse Company for any and all penalties, fines, etc., incurred.
Cleanliness
►The Subcontractor is responsible for leaving the work area clean and free of debris. If it is necessary for Company to remove debris left by the Subcontractor, the Subcontractor will be assessed a clean-up fee of $100.00. The site superintendent or other Company representative will designate an area for all building debris and trash. Such area may be a dumpster or a designated trash pile on the lot.
►Trash, such as lunch or snack trash, is not to be thrown on the floor of the house, in the basement or anywhere on the jobsite other than the designated area for trash and debris. All such trash must be placed in the designated trash receptacle.
►Portable toilets are provided on all job sites. Any Subcontractor employee found using sinks, tubs, commodes, ductwork, closets, etc., as a toilet or trash repository will result in a fine to the subcontractor of $100.00 and that person will not be allowed back on any of Company's jobsites. It is the responsibility of the Subcontractor to impress on its employees and trade contractors that this offensive habit of using any area other than the portable toilets as a toilet facility will not be tolerated.
►No smoking is allowed in any house after exterior sheathing is installed.
Drug-Free Workplace
►Company maintains a drug-free workplace. The use of any controlled substances (drugs) or alcohol on any Company's jobsite is not permitted.
►Should the Subcontractor or its employees be found to be in possession of either drugs or alcohol on any jobsite, the Subcontractor will be requested to leave the jobsite and will not be allowed to return to work until the problem is corrected to the satisfaction of the Company.
Damage To and/or Wasteful Use of Materials
►Damage to materials and installed items such as carpet, vinyl, fixtures, etc., caused by negligence on the part of the Subcontractor or its employees will result in back charges for the amount necessary to replace or repair the item.
►Wastefulness of materials by the Subcontractor, as determined by the Company, will result in the cost of that material being deducted from payment due the Subcontractor.
Insurance
►Subcontractor acknowledges that a requirement of working for Company is for the Subcontractor to have current Worker’s Compensation and General Liability Insurance at all times, naming Company as ADDITIONAL INSUREDS.
►The Subcontractor agrees to indemnify Company and to be responsible for any claims, expenses, or litigation arising from any claim made against Company due to any injury of the Subcontractor’s employee or trade contractor for any worker’s compensation claim.
►The Subcontractor further agrees to indemnify Company and be responsible for any claims, expenses, or litigation arising from any claim made against Company due to the workmanship, equipment, or materials supplied by the Subcontractor.

Relationship with Homebuyer
►Company may, in the course of business, introduce the Subcontractor to a Homebuyer with whom Company has a relationship. The Subcontractor recognizes and affirms that the relationship between Company and the Homebuyer is important and valuable.
►The Subcontractor agrees not to solicit or accept business directly from the Homebuyer for a period of 90 days from the date of the introduction or the date of completion of any project initiated by Company with the Homebuyer, whichever is later.
►This provision shall apply whether or not the Subcontractor actually performs any work for Company on the Homebuyer's project.
Pricing and Change Orders
►All work is quoted and priced per model.
►Payment will be made per the price listed on the purchase order.
►Any change order will be priced per change order.
►No additional work will be considered, allowed, or paid other than that priced on the purchase order, or a Company-approved Change Order.
►Should the Subcontractor be requested to perform any additional work, the Subcontractor must request an additional purchase order from the Site Superintendent.
Inspection Reports
►The Subcontractor representative and a Company representative shall walk the job together and complete each section of the inspection report(s).
►The Subcontractor must correct any deficiency found during the inspection and the job must be 100-percent complete before payment will be made.
►The Subcontractor representative and a Company representative must sign-off on all sections of the inspection report(s) attesting that the job is correct and complete.
Punch List
►The Site Superintendent shall inspect the work of each Subcontractor and will issue a punch-list of all items requiring correction as soon as the Subcontractor has completed the work.
►The Subcontractor is expected to immediately complete their punch-list so that the overall construction of the home and/or the scheduling of the next trade contractor is not adversely impacted.
►Should the Subcontractor not return to complete his or her punch-list within a reasonable time, as determined by the Site Superintendent, the Site Superintendent may hire someone to complete the punch-list and the Subcontractor will be charged for this work.
►The job will not be considered to be complete and no payment shall be made until all punch-list items are completed and approved by the Site Superintendent.
Homebuyer's Walk-Through List
►Any items found on the Homebuyer’s walk-through that require correction must be completed by the Subcontractor immediately upon notification.
►Time is of the essence for completing corrections on Homebuyer’s walk-through.
►If the Subcontractor does not return to correct items listed on the walk-through list within three days, the Company will make the corrections and the Subcontractor will be back-charged. The Subcontractor agrees to reimburse Company for costs associated with repairs, including a 20% add to the charges for Company overhead.
Invoicing Procedure
►Invoices, accompanied by all necessary documentation, must be turned into the Site Superintendent no later than Thursday at 5:00 p.m. If all required work has been completed, invoices will be approved and turned into the office on Friday.
►The Subcontractor representative must sign the Company-issued Work Order before payment will be issued.
►The executed Work Order, which includes a general Lien Release, may be used in place of an invoice to request payment.
Work Order Number
►No invoice shall be paid that does not include the Work Order number for the job. The executed Work Order issued by Company may be used as an invoice.
Warranty
►All work is to be guaranteed for a minimum of one (1) year from date of first occupancy of the house. The Subcontractor agrees to abide by the warranty coverage requirements and time period as they pertain to its trade.

When the “Send Terms and Conditions” button is selected, an email with all the information in this Inspection Report will be sent to the “Builder email” address of the Company Representative completing this report and to the “Subcontractor email” address provided.

Copyright © 2012-2022 Builder-Resources.com and Builder-Academy.com.  All rights reserved.  Used by permission.

🏅 Create a Business Worth Owning

📶 Integrated step-by-step program using all tools and systems

💡 Two coaching sessions per month

📊 Monthly scorecard to measure the journey

🛠️ Tools: All tools (Chart of Accounts, Cost Codes, BBOS Estimator, Builder Business Model Canvas, SubManager, ClientManager, Policy Handbook, Management Scorecard).

🤝 What we do together:

  • A 180+-day engagement covering financials, estimating, subcontractors, clients, and workforce.
  • Coaching sessions every two weeks to review your real numbers and coach policy implementation.
  • A monthly “Business Health Scorecard” that shows where you are strong and where to strengthen.
  • Focus on building a business system that allows you to:
    • move out of day-to-day management;
    • develop a valuable legacy enterprise; and
    • create a business with significant market value.

💲 Investment: $3,500-$5,000.

🪜 Progression logic:

  • This is the capstone — combining all five prior steps into one system that builds a business worth owning.

🎯Outcome: "Now I control my business, not the other way around."

👷 Manage Your Workforce

👷‍♀️ Put the right people in the right position

📄 Create an Organization Chart and Position Descriptions

📄 Integrate employment policies

🛠️ Tools: OrgChart, Position Descriptions, Company Policy Template

🤝 What we do together:

  • Create a Company organization chart.
  • Create Job Descriptions.
  • Implement employee policy handbook
  • Identify inefficiencies in labor margins.
  • Discover hidden labor costs.

💲 Investment: $1,250-$1,500.

🪜 Progression logic:

  • Labor is usually the last controllable variable — now you are tackling optimization and efficiency.

🎯Outcome: "Now I am in control of the work that must be completed, and my employees understand their positions and accountabilities."

🗣️ Control the Client Relationship

📄 Client log, Change Order system

📄 Notice of Completion, Draw Requests

📄 Communication templates for disputes

🛠️ Tools: ClientManager, Client Contact Log, Initial Specifications, NAHB Residential Construction Guide

🤝 What we do together:

  • Implement a structured client management system.
  • Introduce the Client Contact Log.
  • Provide templates for change order and scope adjustments.
  • Train on reducing disputes and managing client expectations.

💲 Investment: $750-$1,250

🪜 Progression logic:

  • With the business financially stable and risk-protected, control of clients and their expectations ensures smoother operations and fewer profit leaks.

🎯Outcome: "Now I can manage clients and their expectations without projects spinning out of control."

🧯Identify and Manage Risks

🏠 Project Risks:

  • Site Risks – site injuries with no primary insurance coverage.
  • Reputational Risks – You don’t deliver what you promised because your subcontractors were not on the same page.
  • Capacity Risks – You can’t deliver what you promised because you don’t have the organizational structure to support your sales.

🔍 Management Risks:

  • Company Structural Risks – You don’t have the right people in the right positions.
  • Promotional Risks – Your market doesn’t know or care about your products.
  • Competitive Risks – You haven’t differentiated your company, so lowest price is the only way you can compete. 
  • Market Demand Risks – a bad market cycle will cripple or destroy your business.

🛠️ Tools: SubManager, Organizing for Success, Builder Business Model Canvas, Budgeting Forecasts

🤝 What we do together:

  • Implement Terms and Conditions, Scopes of Work, and Inspection Reports for all Subcontractors.
  • Review how you track subcontractor insurance and compliance.
  • Analyze your organizational structure to optimize production capacity.
  • Review your business model.
  • Create “Expected Case”, “Best Case”, and Worst Case” budgeting scenarios.

💲 Investment: $1,000-$1,500

🪜 Progression logic:

  • After financial clarity and profitable estimating, risk management provides the next layer of company stability.

🎯Outcome: "Now I can reduce or transfer risk exposure; identify and appeal to my primary market; and plan for any type of economic environment."

🧮Price with Confidence

🔍 Audit your estimating process

🔎 Review all active projects monthly for budget-to-actual performance

🔍 Debrief every completed project for profitability and work flow

📶 Install a margin-tracking dashboard

🛠️ Tools: BBOS Estimator, Overhead Calculator, Completed Project Profitability Report

🤝 What we do together:

  • Audit your current estimating process.
  • Benchmark your margins against industry and market standards.
  • Optimize estimating margins for maximum profitability.
  • Track true budget-to-actual expenditures.

💲 Investment: $750-$1,250

🪜 Progression logic:

  • Once finances are stable, you can sharpen your pricing to stop leaving money on the table.
  • You’ll know the margin to use to make sure overhead is allocated profitably. 

🎯Outcome: "Now I can bid jobs knowing I'll profit, not just hoping for profit."

💰90-Day Financial Reset

🗄️ Rebuild Chart of Accounts on NAHB Model

🗃️ Rebuild Cost Codes on CSI model

🛠️ Tools: Accounting platform, NAHB Chart of Accounts, CSI Cost Codes, Management Scorecard

🤝 What we do together:

  • Access to your accounting platform is required.
  • Rebuild your Chart of Accounts for project-level profitability.
  • Create and align Cost Codes so estimating, job costing, and reporting all “speak the same language.”
  • One-on-one coaching call every two weeks during the program to interpret your numbers.

💲 Investment: $1,500-$3,000

🪜 Why start here?

  • Without financial clarity, nothing else matters.
  • The reason you are in business is to make a profit. 
  • Do you KNOW if you are doing that?

🎯Outcome: "Now I know if my business is profitable and my business model is sound."

You will be re-directed to the Home Page where you can use the menu to access Courses, Memberships, or Application Portals.